FNQ: Gulf Developmental Road bridge inspections, Gilbert River bridge and Routh Creek bridge

Source: Department of Transport and Main Roads

 

The Department of Transport and Main Roads (TMR) will be carrying out bridge inspections on the Gulf Developmental Road at the following locations:

  • Gilbert River Bridgebetween Croydon and Georgetown: 2 – 4 December 2025
  • Routh Creek Bridgebetween Georgetown and Mount Garnet: 5 December 2025

The inspections are part of TMR’s regular bridge maintenance program to ensure the continued safety and reliability of bridges on the state-controlled road network.

For the safety of road users and maintenance crews, periodic full closures of the bridge will be in place. The bridges are scheduled to be closed at the following times, weather and construction conditions permitting:


Gilbert River Bridge

Closed                        7:30am         –        9:30am
Open                          9:30am         –        9:45am
Closed                        9:45am         –        11:45am
Open                          11:45am       –        12:00pm
Closed                        12:00pm       –        2:00pm
Open                          2:15pm         –        2:30pm
Closed                        2:30pm         –        4:30pm
Open                          4:30pm onwards


Routh Creek Bridge

Closed                        7:30am         –        9:30am
Open                          9:30am         –        9:45am
Closed                        9:45am         –        11:45am
Open                          11:45am onwards


Work crews will ensure emergency service vehicles are provided with access if required.

Variable Message Signs (VMSs) will be in place on the approaches to the work site to ensure motorists are aware of the changed traffic conditions. Changes in dates due to poor weather will be posted on the VMS.

If you required further information about these works, please contact TMR via email at cairns.office@tmr.qld.gov.au or via phone on 4045 7144.