Road Conditions: South West District, Eastern Reseal Program

From Department of Transport and Main Roads

The Department of Transport and Main Roads will be starting reseal works on various sections of roads in the South West District on 2 February 2024, weather and conditions permitting.

Reseals are part of our ongoing maintenance program for the South West District and are an important part of our overall maintenance program. Resealing our roads preserves the surface and improves the reliability of the road network.

The following road sections are scheduled for resealing:

  • Roma - Condamine Road, between .04km to 14.27km
  • Moonie Highway (Dalby - St George), between 211.96km to 293.64km 

Works will be undertaken between 6am and 6pm over a 6-day week and are expected to be completed in late February 2024, weather and conditions permitting.

We will try to minimise traffic delays as much as possible by using single lane closures, traffic control and speed restrictions. Motorists should slow down, drive carefully and follow the instructions of traffic controllers and construction signage and allow up to an additional 15 minutes for their journey.
 
Works may restrict wide-load vehicle access and permit holders should check the TMR Conditions of Operation Database before travelling.

For the latest traffic and travel information visit QLDTraffic.qld.gov.au or call 13 19 40. For any other enquires please contact 13QGOV.