SWQ: Reseal Preparation Work
Source: Department of Transport and Main Roads
The Department of Transport and Main Roads have started reseal preparation works, to repair damaged and rough sections of the below roads within the South West District.
- Warrego Highway (Miles - Roma), between 13.69km and 14.8km east of Wallumbilla.
- Warrego Highway (Mitchell - Morven), between 26.44km and 38.55km east of Morven.
- Carnarvon Highway (Roma - Injune), between 40.98km and 72.65km north of Roma.
Works will be undertaken between 6am and 6pm up to seven days a week and are expected to be completed by April 2026, weather and conditions permitting.
We will try to minimise traffic delays as much as possible by using traffic control, speed restrictions and single lane closures. Motorists should slow down, drive carefully and follow the instructions of traffic controllers and construction signage and allow up to an additional 15 minutes for their journey.
Works may restrict wide-load vehicle access and permit holders should check the TMR Conditions of Operation Database before travelling.
For the latest traffic and travel information visit QLDTraffic.qld.gov.au or call 13 19 40. For any other enquires please contact 13QGOV.
Please don’t hesitate to call 4622 9511 during business hours, (8am to 5pm), or email SouthWest.office@tmr.qld.gov.au if you have any questions, concerns or feedback.
