Wide Bay Region: Mary River bridge on Mungar Road, annual bridge inspection

Source: Department of Transport and Main Roads (13.06.2025)

The Department of Transport and Main Roads (TMR) has scheduled a temporary closure of the Mary River bridge on Mungar Road to allow an annual routine bridge inspection and servicing to be undertaken.

The bridge will be closed to all traffic from 6am to 6pm on Sunday 15 June 2025, weather and conditions permitting.

During the closure, advance signage will be in place advising motorists of the changed traffic conditions and closure ahead. Motorists who live on the western side of the bridge are advised to seek an alternate route and allow for additional travel time.

Electronic signs will be in place in advance of the bridge closure to advise motorists of the changed conditions. Up-to-date information on road conditions is also available at www.qldtraffic.qld.gov.au or by downloading the QLDTraffic App (available from the app store).

The inspection is routine and is required to maintain the structure in a safe condition.

If you have any concerns, please contact the project team via email Bundaberg.office@tmr.qld.gov.au or call 1300 728 390.