Source: TMR HV Access
The Department of Transport and Main Roads (TMR) has advised of changed traffic conditions on the Bowen Developmental Road (88B), approximately 25–35km east of Mount Coolon, while geotechnical investigation works are undertaken.
Works will involve test pit excavations and sampling at approximately 20 locations along the road.
During the works, single-lane closures will be in place with reversible traffic flow controlled by manned traffic lights during daylight hours.
Traffic management will progressively move between investigation sites, with the available traffic lane width reduced to 3.0 metres.
Operators transporting oversize (wide) loads must notify the site team prior to travelling through the work area to allow arrangements to be made for safe passage.
Temporary delays of up to one hour may be required to facilitate oversize vehicle movements through the work site.
Site contacts:
For further information, contact TMR Mackay/Whitsunday District:
Phone: 4951 8555 (Option 3)
Email: mackay.office@tmr.qld.gov.au
Operators are encouraged to plan their movements accordingly and allow additional travel time during the works.