Source: TMR HV Access
The Department of Transport Main Roads wishes to advise that works will be undertaken on the intersection of the Bruce Highway and Farleigh Habana Road, Farleigh from 9 to 21 November 2026.
Lane closures, speed limit reductions and traffic control will be in place for the duration of the works with the single lane traffic lane width being reduced down to 3.5m.
Minimum 24 hours notice notification to site contacts are required for any over sized (wide) vehicles exceeding 3.5m in width so as the site team can make arrangements to facilitate movements through the construction site. Failure to meet these conditions may result in delays to access through the works site
Site contacts:
For further information, contact TMR Mackay/Whitsunday District:
Phone: 4951 8555 (Option 3)
Email: mackay.office@tmr.qld.gov.au