Road Conditions - 1 May, 2025
CQ: Track Maintenance (Ardurad Road inaccessible) – Blackwater Rail System (Aurizon)
Please be advised Aurizon Network will soon commence rail activities along the Blackwater Rail System, Blackwater township to Sagittarius Down Road between 189.605km to 189.635km. Level Crossing repairs are planned to be undertaken from 1900 hours on Monday, 12 May 2025, and 0500 hours on Tuesday, 13 May 2025. During these works Level Crossing #661 Ardurad Road will be inaccessible with two possible diversion routes in place (weather permitting).